Ontario’s open data catalogue puts the rule in one sentence: “Companies or organizations who take over 50,000 litres of water/day from a lake, river, stream or groundwater source, must obtain a Permit to Take Water from the Ministry of the Environment -with a few exceptions.” The permit exists under section 34 of the Ontario Water Resources Act (OWRA) and is issued by the Ministry of the Environment, Conservation and Parks, which coordinates Ontario’s actions on climate change “in the name of healthier communities, ecological protection and economic prosperity”. Elsewhere in Canada the same permission carries another name, given in the table below.
This guide covers who needs a permit in each province and territory, the six application steps, what permit holders must record and report, and where existing permits are published.
Who Needs a Permit to Take Water
Volume Thresholds by Province and Territory
| Province or territory | Permission | Law | Issued by | When it is needed | Household use |
|---|---|---|---|---|---|
| Newfoundland and Labrador | Water Use Licence | Water Resources Act | Department of Environment, Conservation and Climate Change | Any non-domestic use | Domestic purposes exempt |
| Prince Edward Island | Water withdrawal permit | Water Act, Water Withdrawal Regulations | The Minister | More than 25 m³ a day from a well, watercourse or wetland, or any supply to a water supply system | Nothing needed below 25 m³ a day |
| Nova Scotia | Water withdrawal approval | Environment Act, Activities Designation Regulations | Nova Scotia Environment and Climate Change | More than 23,000 litres a day from surface water or groundwater | Most households use 700 to 1,400 litres a day |
| New Brunswick | EIA registration with a Water Supply Source Assessment, then an approval to operate the waterworks | Clean Environment Act | Provincial environment department (EIA Branch) | Waterworks with a capacity over 50 m³ a day, for the extraction of surface or groundwater “for any intended use” | Household wells fall below the trigger |
| Quebec | Ministerial authorization for water withdrawals | Environment Quality Act | Ministère de l’Environnement, de la Lutte contre les changements climatiques, de la Protection de la biodiversité, de la Faune et des Parcs | 75,000 litres a day or more, or less when the water supplies 21 people or more, is sold as spring or mineral water, or leaves the St. Lawrence River Basin | Single-household wells exempt from declaration |
| Ontario | Permit to Take Water | OWRA and O. Reg. 387/04 | Ministry of the Environment, Conservation and Parks | More than 50,000 litres on any day | Domestic use under 379,000 litres a day exempt |
| Manitoba | Water Rights Licence | The Water Rights Act | Water Use Licensing Section | Municipal and industrial uses at any volume, other uses above 25,000 litres a day | Domestic, agricultural and irrigation use under 25,000 litres a day exempt |
| Saskatchewan | Water Rights Licence | The Water Security Agency Act | Water Security Agency | ”all non-domestic use or where domestic use exceeds five cubic decameters” | Domestic use up to 5,000 m³ a year exempt, a limit set on the agency’s pages |
| Alberta | Licence, temporary diversion licence or traditional agriculture registration | Water Act | Environment and Protected Areas, or the Alberta Energy Regulator for energy and minerals | Any diversion “for any purpose” unless exempted | Up to 1,250 m³ a year per household exempt |
| British Columbia | Water licence or use approval | Water Sustainability Act | Ministry of Water, Land and Resource Stewardship, or the BC Energy Regulator for energy resource activities | Any diversion unless exempted; “all users of groundwater for non-domestic purposes need a licence” | Domestic groundwater use exempt |
| Yukon | Type A or type B water licence | Waters Act | Yukon Water Board | From 100 m³ a day for industrial and municipal undertakings, 300 m³ a day for placer mining and agricultural undertakings | Domestic users exempt |
| Northwest Territories | Type A or type B water licence | Waters Act, or the Mackenzie Valley Resource Management Act in federal areas | Land and water boards, Inuvialuit Water Board | From 100 m³ a day for most uses, 50 m³ a day for municipal use | Below the licence thresholds |
| Nunavut | Type A or type B water licence, and a Board approval for smaller uses | Nunavut Waters and Nunavut Surface Rights Tribunal Act | Nunavut Water Board | Board approval below 50 m³ a day, type B from 50, type A from 300 | Domestic use exempt |
The province or territory where the water is issues water taking permits. Environment and Climate Change Canada says so directly: “Most major uses of water in Canada are permitted or licensed under provincial water management authorities.” In the territories, water boards issue the licences. The same federal page still lists the Northwest Territories under federal management, although the territory’s Waters Act has applied since April 1, 2014.
Everywhere in Canada, a water taking falls into one of three cases. It is exempt; it qualifies for a lighter registration or a short-term permission; or it needs a full permit or licence. Ontario’s water program states it plainly: a PTTW is required “for any person who takes more than 50,000 litres of water per day, unless that activity is required to be registered in the EASR, or the activity is exempt”.
A common assumption is that a region or municipality issues these permits. It does not: the province issues them, including to municipalities. A business that buys its water from a municipal system needs no permit of its own, since Ontario exempts anyone who receives “water supplied by someone with a valid Permit to Take Water (such as a municipality or your neighbour)”.
Ontario’s test looks at the most water taken on any single day, not an average. A permit is required “if you plan to take more than 50,000 litres of water from the environment on any day”. The ministry’s own comparison: an average backyard pool of 8 metres by 4 metres by 1.5 metres holds about 50,000 litres of water.
The ministry names commercial, industrial, agricultural and municipal users, among others, as the usual permit holders. A site with several wells or intakes has to determine its total by adding up the maximum daily volume of every source. If some sources are never used on the same day, the applicant can ask for a lower total: two wells at 300,000 litres a day each make 600,000 litres, or 300,000 litres if they are never pumped together. The application states that total as the maximum amount of water to be taken in a day.
Exempt Water Takings
Household use is exempt nearly everywhere, within limits:
- Ontario: under 379,000 litres a day for domestic use, other than by a municipal drinking water system or a public utility, and for watering livestock or poultry.
- Alberta: up to a maximum of 1,250 m³ a year per household.
- Saskatchewan: up to 5,000 m³ of groundwater a year, where domestic purposes include the watering of stock and the spraying of crops. The limit comes from the Water Security Agency’s pages, and for surface water the agency applies it “By policy”.
- Manitoba: under 25,000 litres a day for domestic, agricultural or irrigation use.
- British Columbia: domestic groundwater use, plus domestic use of unrecorded water from a stream (Water Sustainability Act, s. 6(3)).
- Newfoundland and Labrador: domestic purposes, which cover the household, sanitation, fire protection, domestic animals and poultry, and a garden next to the dwelling.
- Yukon and Nunavut: domestic users.
Firefighting and emergencies are exempt in Ontario, British Columbia, Alberta, Prince Edward Island (fire suppression from watercourses and wetlands), Yukon and Nunavut. Manitoba is the exception: it lists fire fighting as a licensable “other” purpose.
Other exemptions worth knowing:
- Ontario: wetland conservation; weirs built before March 29, 2016; certain in-stream diversions for construction; dams for electricity; renewable energy projects with a Renewable Energy Approval; early mineral exploration under a Mining Act plan or permit; and works built before March 30, 1961. Foundation drainage under 379,000 litres a day is exempt for any building since September 1, 2026, when O. Reg. 251/26 removed the words limiting it to residential buildings (O. Reg. 387/04, s. 4.2 (10)). The ministry page, updated October 5, 2026, still says “primarily for residential purposes”. Every condition of an exemption must be met for it to apply.
- Quebec (REAFIE, s. 173): ditches and drains, building drainage, a single naturally fed irrigation pond averaging no more than 379,000 litres a day, temporary civil engineering work of up to 180 days, aquifer pump tests of up to 30 days, coffer dams, dredging, and, since August 13, 2026, withdrawals from the St. Lawrence estuary or gulf or the sea, except for human consumption or food processing.
- Alberta (Water (Ministerial) Regulation, Schedule 3): roof rainwater, wells with a manual pump, dugouts up to 7,500 m³ a year, camps up to 2,500 m³ a year, and up to 100 m³ a day for bridge washing or dust control.
- Nova Scotia (Activities Designation Regulations, s. 5D): non-recurring use of a watercourse for less than two weeks in a year, seawater and brackish intertidal water.
- Prince Edward Island: filling a swimming pool of up to 100 m³, and filling mobile containers for crop protectants or road dust suppression.
- Newfoundland and Labrador: no licence for mineral exploration drilling, shellfish marine aquaculture or water bottling.
Two points cause frequent confusion. First, a small pump drawing from a creek needs no permit in Ontario while it stays at or under 50,000 litres on any day, whereas British Columbia licenses most uses beyond domestic use of unrecorded water. Second, agricultural irrigation is not exempt in Ontario above 50,000 litres a day: only its application fee is waived.
An exemption from the permit does not exempt the activity from other approvals, as the Ontario ministry points out, and British Columbia treats livestock watering on ranches, feedlots and farms as an industrial purpose that needs an authorization. In other words, the exemptions are a few exceptions, each with its own conditions, and the rules on land use and water control still apply around them.
EASR Registration and Short-Term Permissions
Ontario registers three water takings on the Environmental Activity and Sector Registry (EASR) instead of issuing a PTTW, under O. Reg. 63/16:
- surface water takings over 50,000 litres a day for highway and transit projects;
- construction site dewatering above 50,000 litres of groundwater, stormwater or both on any day, with no daily maximum in the current regulation;
- pumping tests of 7 days or fewer within 30 days, up to 5,000,000 litres a day.
A PTTW issued before July 1, 2025 for construction dewatering, or before July 1, 2021 for the two other activities, stays valid until it expires.
| PTTW | EASR registration | |
|---|---|---|
| Legal basis | OWRA and O. Reg. 387/04 | Environmental Protection Act and O. Reg. 63/16 |
| Process | Ministry review and, where required, a 30-day public posting | Online registration by the business itself |
| Technical report | Submitted with category 2 and 3 applications | Prepared by a qualified person before registering and kept for inspection |
| Expiry | A set date | None: the registration is removed when the taking ends |
| Reporting | Daily volumes, reported by March 31 | The same: daily volumes, reported by March 31 |
The ministry says the EASR “makes it faster, simpler and more cost-effective for businesses to start these low-risk water takings”.
Other provinces and territories offer short-term or lighter permissions:
- Alberta: a Temporary Diversion Licence for one year or less (Water Act, s. 63), for example for dust control or drilling oil and gas wells, and a traditional agriculture registration of up to 6,250 m³ a year, with no expiry date.
- British Columbia: a use approval for up to 24 months (Water Sustainability Act, s. 10).
- Saskatchewan: a Temporary Water Rights Licence for temporary industrial processing, typically two to four weeks, at $200 per point of diversion.
- Quebec: between 50,000 and 75,000 litres a day, an annual declaration of withdrawals without an authorization.
- Yukon: a Schedule 3 notice, filed at least 10 days ahead, for small industrial, placer and quartz mining uses. In the Board’s words, it “is not a permit or a licence”.
- Nunavut: a Board approval without a licence for uses under 50 m³ a day, valid one year.
Construction dewatering is handled differently in each province. Ontario uses the EASR. British Columbia has exempted, since February 27, 2026, up to 300 m³ of groundwater a day, or up to 1,000 m³ with a qualified professional, in both cases over 24 months or less. Alberta exempts dewatering lasting 6 months or less, Quebec exempts temporary civil engineering withdrawals of up to 180 days from authorization, and Prince Edward Island does not treat keeping a work area dewatered as a withdrawal. Check which rule applies before you determine whether the site needs a permit at all.
How to Apply for a Permit to Take Water
Step 1: Determine Which Permission and Category Apply
Before filling in any form, identify which permission the taking needs (its name in each province and territory is in the thresholds table) and which type, category or tier it falls in. That choice sets the studies, the documents and the fee.
Ontario offers seven application types:
- a new permit;
- a renewal, for the same or a lesser amount, purpose, location and source;
- an administrative change;
- an amendment, to change the amount, purpose, location or source;
- a paper to electronic transition, free, which moves reporting online;
- an ownership change;
- an expired permit: a renewal within 12 months of expiry, a new permit after that.
Ontario then sorts applications by risk: “the greater the potential risk, the more evaluation and assessment required”.
| Category | Risk | Examples |
|---|---|---|
| Category 1 | Low | Renewals with no past interference or impacts and no scientific study required; irrigation or agricultural ponds not connected to, nor receiving water from, surface water, and less than 4 m deep and more than 100 m from sensitive features, or less than 7 m deep and more than 250 m from them; runoff ponds under 1,500 m³; Great Lakes takings under 1,000,000 litres a day |
| Category 2 | Medium | Short-term groundwater takings under 7 days, or under 30 consecutive days and 400,000 litres a day; Great Lakes takings under 19,000,000 litres a day; rivers of order 3 or higher under 5% of the 7Q20 low flow; takings and returns such as cooling or hydrostatic testing |
| Category 3 | Highest | Everything else, including “new takings from 1st or 2nd order watercourses, wetlands, new on-stream reservoirs, impoundments and ponds” |
Sensitive features include a stream, a wetland, and a dug well or dugout pond owned by someone other than the permit holder. An application with several sources takes the highest category among them.
The other provinces and territories sort applications this way:
- Newfoundland and Labrador: by purpose (municipal, agricultural, commercial, industrial, power).
- Prince Edward Island: by source: a low capacity well (25 to 345 m³ a day), a high capacity well (345 m³ a day or more), or a watercourse or wetland.
- New Brunswick: by instrument: the EIA registration with a Water Supply Source Assessment, the approval to operate the waterworks, and a Watercourse and Wetland Alteration (WAWA) permit for an intake.
- Quebec: by fee tier, above 75 m³ and above 379 m³ a day.
- Manitoba: by source, with one licence per source.
- Saskatchewan: by permission: a licence plus an Approval to Construct and Operate Works.
- Alberta and British Columbia: by duration: a licence or a short-term permission.
- The territories: by volume and undertaking: type B or type A.
In Ontario, the type of source moves the category: a Great Lakes intake, a river of order 3 or higher and a new taking from a 1st or 2nd order stream sit in different rows, and a lake or groundwater source is judged on its volume and duration.
Step 2: Retain a Qualified Person for the Technical Studies
The larger or riskier the taking, the more technical evidence the application needs. A small or low-risk taking may need none; a large one needs a hydrogeological study with pumping tests, or a surface water study, prepared by a professional engineer or geoscientist. Quebec defines its hydrogeological study as “a study signed by an engineer or geologist” (REAFIE, s. 3). In Manitoba, a groundwater project may require “a professional hydrogeologist registered with Engineers Geoscientists Manitoba” to “oversee drilling and pump testing”. Nova Scotia (2010) and Manitoba (2013) each publish a Guide to Groundwater Withdrawal Approvals that sets out the studies they expect.
In Ontario, category 2 and 3 applications need a qualified person:
- for groundwater studies, a licensed professional geoscientist or an accepted professional engineer;
- for surface water studies, a professional engineer, or a person with a degree in environmental science specialized in hydrology, aquatic ecology, limnology, biology, physical geography or water resource management.
What the qualified person produces depends on the category. For category 2, it is a scientific evaluation that confirms the category, sets the rate, volume, timing and duration of the taking, plans monitoring, mitigation and contingency measures, and shows the discharge causes no significant impact. For category 3, it is a hydrogeological study and/or a surface water study prepared under the ministry’s technical guidance. For a pumping test, it is a signed document confirming no unacceptable impacts and an approved method to discharge the water taken.
Technical requirements elsewhere:
- New Brunswick: a Water Supply Source Assessment, which evaluates the supply for adequate quantity (sustainability), water quality and potential impacts on existing water users.
- Prince Edward Island: a groundwater exploration permit before drilling a high capacity well.
- Saskatchewan: a Permit to Conduct Ground Water Investigation before groundwater works.
- British Columbia: a qualified professional for construction dewatering between 300 and 1,000 m³ a day.
For category 2 and 3 takings, that study is the core of the application process.
Step 3: Describe the Sites, Sources and Water Takings
Every application asks for the same core facts: the source (lake, pond, watercourse or well) and its exact location, the purpose, the maximum rate, the maximum and typical volumes per day, the number of days a year and the months of taking. Yukon’s form asks for the “Quantity of Water to be used” in m³ a day. Manitoba states that “A separate licence is required for each source from which water is to be obtained.” Newfoundland and Labrador’s form asks for the suggested duration of the licence.
Justify the volume. Ontario wants the calculations behind each rate and volume and warns that “The PTTW program is not intended for water reservation”. A source vulnerable to drought needs contingency measures, and long-term takings describe the water conservation practices of their sector. For each purpose, location, water source and maximum volume, the reviewer expects a number backed by a calculation.
Land and neighbours matter too. A taking from land the applicant does not own needs the landowner’s letter in Ontario (“A PTTW does not give permission to trespass or use equipment that you do not own”) and the owner’s written permission in Prince Edward Island. Ontario applicants also check the source protection maps and describe any known complaints or impacts.
Alberta now requires applicants to submit a copy of every related agreement, and a written statement of the terms, including any consideration paid, when an arrangement is not in writing (Water Act, ss. 50.1 and 62.1, in force since the Water Amendment Act took effect on March 11, 2026).
Step 4: Assemble the Supporting Documents
The form travels with a map that locates each source and, where one is required, the technical study:
- Newfoundland and Labrador: a “1:50,000 NTS scale map showing exact location of water use or diversion (must be included)”.
- British Columbia: a map or drawing that meets its Water Licence Application Drawing Standards.
- Manitoba: a “sketch plan of location of proposed well(s)”.
- Northwest Territories: an overview map and a detailed map in the application package.
Ontario asks for:
- the qualified person’s study for categories 2 and 3;
- a topographic map marking every taking location and every feature within 500 metres (other wells, springs, watercourses, wetlands, property lines, dwellings), made with the Make a Topographic Map application of the Ministry of Natural Resources or the environment ministry’s “Create a map for a Permit to Take Water application” tool;
- for a renewal, the existing permit’s number and the issuance date and expiry date of the permit;
- notes of any pre-submission consultation.
Bottled water companies seeking a new or increased groundwater taking in Ontario first need a resolution of the host municipal council when cumulative takings in the municipality reach 379,000 litres a day or more. The council has 12 months to answer, and a supporting resolution is valid five years.
Elsewhere, Nova Scotia asks for “Two physical copies each of items 1 to 3” plus an electronic copy of any required data or reports. New Brunswick starts with the EIA registration document and the WSSA Initial Application form. In Labrador, “Applications will be considered incomplete until the Indigenous Consultation has been completed.”
Step 5: Submit the Application and Pay the Fee
The application goes to the body named in the thresholds table, almost always with a fee scaled to the volume, category or purpose: from $30 for a territorial water licence to $5,126 in Quebec above 379 m³ a day in the Great Lakes-St. Lawrence River Basin. Agricultural takings pay no application fee in Ontario (irrigation and frost protection), Nova Scotia and Quebec.
In Ontario:
- the application is made online, from a ministry account created with Ontario.ca login, which gives 24/7 access to the account, and the ministry offers one-on-one assistance;
- mining proponents can use the Ontario Business Account, which also lets them find and track permits, approvals and permissions from several ministries in one place;
- fees are $750 for categories 1 and 2 and $3,000 for category 3, with no fee for agricultural irrigation and frost protection or aquaculture (agribusiness and food processing excluded);
- the application is not submitted until it is paid, and a refund may be issued if an application is cancelled;
- knowingly giving false or misleading information breaks section 98 of the OWRA, a section 109 offence: on a first conviction, fines run from $5,000 to $4,000,000 a day for an individual and from $25,000 to $6,000,000 a day for a corporation;
- applicants can follow the file with the ministry’s “Find and track a PTTW application” tool.
| Province or territory | Where to apply | Application fee |
|---|---|---|
| Newfoundland and Labrador | Forms e-mailed or delivered to the department, fees payable online | $400 for agricultural, commercial or temporary use; $800 for cooling, washing and asphalt plants; $2,000 for industrial use; $400 to $2,000 for municipal supplies; HST extra |
| Prince Edward Island | Application to the Minister | Five-year fee from $100 for a low capacity well to $3,000 for a high capacity well above 1,000,000 m³ a year; $2,000 for a watercourse or wetland |
| Nova Scotia | Paper form with the fee, from a regional office or the website | $331.75; none for agriculture, aquaculture or recreation |
| New Brunswick | EIA registration with the EIA Branch, contacted first while its online portal is developed; WAWA permits online | $1,100 for the EIA registration (Category 3); $25 per WAWA permit |
| Quebec | The ministry’s online service, with a clicSÉQUR account | $2,214 above 75 m³ a day; $5,126 above 379 m³ a day in the Great Lakes-St. Lawrence River Basin; none for agricultural activities; at most $1,282 per activity for businesses of 10 employees or fewer |
| Manitoba | The online Water Licensing Portal, card payment at application | $100 |
| Saskatchewan | Form RG-103 by e-mail | $100 to $1,000 by volume, plus $500 for the works approval, less the fee paid for the groundwater investigation permit |
| Alberta | The Digital Regulatory Assurance System (DRAS), or the Alberta Energy Regulator’s OneStop for energy and minerals | No fee up to 62,500 m³ a year, then from $90, rising with volume |
| British Columbia | Online through FrontCounter BC, or the BC Energy Regulator for energy resource activities | From $250 |
| Yukon, Northwest Territories, Nunavut | The water board’s application, through Waterline in Yukon | $30 |
Step 6: Review and Decision
The regulator checks that the file is complete, reviews the technical evidence, gives the public and Indigenous communities a chance to comment where its process requires it, then issues the permission with an expiry date and conditions, or refuses it.
In Ontario, the review runs through:
- completeness screening;
- where required, a posting on the Environmental Registry of Ontario for at least 30 days (takings under a year, crop irrigation, livestock watering, emergencies and takings already reviewed in an equivalent public process may not be posted);
- a technical review of the scientific evidence;
- notice to Indigenous communities, municipalities and conservation authorities where appropriate;
- information requests, with cancellation of the application if deadlines are missed.
Approval does not end the regulator’s control over the taking. Before deciding, the ministry weighs Indigenous and treaty rights, conformance with the regulations, ecosystem needs, water availability, the intended use, the potential impact on other water users, source protection and public comments. Where demands compete, it applies the priorities of water use added on April 1, 2021. An approved permit carries an expiry date and legally binding conditions; a refusal can follow inadequate design, compliance or legal issues, or a finding that the taking is not in the public interest.
Elsewhere:
- Alberta posts applications on the DRAS public notice board, and the Alberta Energy Regulator publishes its own notices and decisions. Alberta keeps “first-in-time, first-in-right” priority and has closed the Bow, Oldman and South Saskatchewan sub-basins to new licences since 2007.
- The Northwest Territories’ boards post applications to their public registry and Online Review System, and type A licences need the minister’s approval: the territorial minister in most of the territory, the federal minister in federal areas.
- Nunavut’s type A licences go to the federal minister for approval.
Operating with a Permit to Take Water: Records, Reporting, Changes and Renewal
Ontario’s ministry lists four obligations for permit holders: collect and record the daily amount of water taken; comply with the terms and conditions in the permit; immediately report complaints or interference to the ministry; and report water takings each year. Permit holders are legally required to meet all four. The other provinces and territories impose the same kinds of duties, detailed below.
Recording Daily Water Takings
Ontario’s rule sits in section 9 of O. Reg. 387/04: every permit holder “shall collect and record data on the volume of water taken daily”, and the data “shall be measured by a flow meter or calculated using a method acceptable to a Director.” The Ontario open data page puts it plainly: “Permit holders are legally required to record how much water they take each day.”
Measurement rules elsewhere:
- Quebec: “direct measurement” by measuring equipment that belongs to the withdrawer, a register kept 5 years, and a meter accuracy check at least once every 3 years, within 10%.
- Saskatchewan: month-end meter readings for each well on the agency’s groundwater report form.
- Manitoba: a meter or timing device, under a clause in every licence.
- Newfoundland and Labrador: flowmeters under the licence conditions.
- Nova Scotia: daily monitoring, usually with flowmeters.
- Nunavut: daily records in cubic metres, with the method used.
- British Columbia and Alberta: whatever the licence sets, or in British Columbia an engineer’s order. Alberta’s Water Amendment Act (March 11, 2026) lets the government set measurement and reporting expectations for all licence holders.
Measured volumes set the bill in several places:
- Quebec’s charge is $37.13 per million litres in 2026, and $159.14 for activities that incorporate water into their products, such as bottling and beverages.
- Saskatchewan’s industrial charges and Manitoba’s annual use fee are computed on volumes.
- In Newfoundland and Labrador, an industrial user without metering equipment pays the minimum charge.
- Under Ontario’s O. Reg. 450/07, a facility in one of seven charged classes (bottled water, beverages, fruit and vegetable canning, ready-mix concrete, non-metallic mineral products, agricultural chemicals, inorganic chemicals) that does not submit its daily data can be charged on the volume its permit authorizes. The Ontario rate is $3.71 per million litres, and $503.71 for bottlers taking groundwater.
Yearly charges after the permit is issued, besides Quebec’s, are computed on measured volumes in some places and on the authorized maximum amount in others:
- British Columbia: annual water rentals on the licensed quantity, due “whether or not the rights granted under the licence are exercised” (local providers’ irrigation and waterworks licences and pulp mills pay on the volume they report). Rates are $2.25 per 1,000 m³ for most industrial, commercial, bottling and waterworks purposes and $1.30 for cooling, both with a $200 minimum, and $0.85 for irrigation, livestock, lawns and crop processing, with a $50 minimum. Domestic groundwater users pay no rentals (Water Sustainability Fees, Rentals and Charges Tariff Regulation, s. 4 and Schedule 2).
- Nova Scotia: an annual administration fee of $265.40 for domestic, industrial, bottled water or public drinking water supply approvals ($663.45 for hydroelectric use), plus an annual approval to use fee of $145.95 for each 1,000,000 litres a day approved up to 2,000,000, rising by tier to $179.10 above 90,000,000, with a $66.15 minimum. Agriculture, conservation and beautification pay no approval to use fee (Fees Regulations, ss. 7 and 8, as amended to March 24, 2026).
- Newfoundland and Labrador: annual water use charges on commercial and industrial licences: $5 per 1,000 m³ licensed and used plus $0.50 per 1,000 m³ licensed but not used for commercial purposes, $10 and $1.00 for industrial purposes, and a $1,000 minimum for an industrial user without water metering equipment. These are the base amounts of the 2016 Water Use Charges Regulations (s. 3), indexed to the Consumer Price Index every January 1.
- Manitoba: an additional annual fee on the volume diverted for industrial and “other” purposes (for example recreation and heating or cooling systems): $1.00 per cubic decametre (1,000,000 litres) for the first 100, then $1.25, $1.50, $1.75 and $2.00 per cubic decametre by tier up to 100,000 a year (Water Rights Regulation, Schedule B). Municipal, agricultural and irrigation projects are exempt.
- Saskatchewan: industrial water use charges per 1,000 m³, billed on recorded or estimated diversion, effective July 1, 2026: $64.27 for water from the South Saskatchewan River, Lake Diefenbaker, Buffalo Pound Lake, the Qu’Appelle and Souris rivers and the Rafferty, Boundary and Grant Devine reservoirs; $20.56 from other sources with total dissolved solids of 4,000 mg/L or less, and for non-consumptive cooling in thermal plants; $2.58 for water above 4,000 mg/L, except from the Blairmore or deeper formations; $20.86 for temporary industrial users. Agricultural users and industries supplied by municipal waterworks are exempt.
- Yukon, Northwest Territories and Nunavut: an annual water use fee on the volume the licence authorizes. For industrial and mining undertakings, it is the greater of $30 and $1 for each 100 m³ a day up to 2,000 m³ a day, $1.50 for each 100 m³ a day between 2,000 and 4,000, and $2 above (half of that for placer mining in Yukon). For agricultural undertakings, it is the greater of $30 and $0.15 per 1,000 m³. Nothing is due for the use of waters on Inuit-owned lands in Nunavut (Yukon Waters Regulation, s. 8; Northwest Territories Waters Regulations, s. 8; Nunavut Waters Regulations, s. 12).
- Alberta: no charge on the water itself. The government stated that “Royalties, bulk or volumetric pricing of water are not included in these amendments” (March 11, 2026), and the Act’s fee section covers applications, documents, hearings and services, plus water used to produce power (s. 168).
The figures can become public. Ontario publishes the daily and annual volumes reported for each permitted source (O. Reg. 387/04, s. 9.1, “Water Taking” dataset). Quebec publishes authorized volumes by site and municipal water use estimates built from the declarations made since 2012. Alberta announced that, under its new rules, “Reporting will be made public.”
Reporting Water Takings: Deadlines and Systems
In Ontario, the daily volumes of the previous year are due by March 31 for each location, or a “no taking” report if no water was taken (O. Reg. 387/04, s. 9(3)). Permits issued online report in the Regulatory Self-Reporting System (RSRS); paper permits report in the Water Taking Reporting System (WTRS). The RSRS accepts values typed in or pasted from a spreadsheet, submitted in litres. Days without taking are left blank rather than recorded as zero, and the holder certifies that no water was taken on the blank days. Submitted takings can be updated afterwards in the RSRS, under Post Approval Submissions, with the reason for the update.
| Province or territory | What is reported | Deadline | System |
|---|---|---|---|
| Newfoundland and Labrador | Monthly use, with a spreadsheet of daily use | January 31 | |
| Saskatchewan | Month-end meter readings for each well; monthly industrial reports | Industrial reports by the 10th of the following month | Agency forms |
| Manitoba | Water use records | February 1, or on request | Water Use Licensing Section |
| New Brunswick | As set by each approval | As set by each approval | As set by each approval |
| Quebec | Monthly and annual volumes, in litres | March 31, with the charge due by the same date | The online water withdrawal service |
| Nova Scotia | Flow records, as set by the approval | On request, no general deadline found | As set by the approval |
| Prince Edward Island | Flow data, as set by the approval | On request, no general deadline found | As set by the approval |
| Alberta | As set by the licence | As set by the licence | As set by the licence |
| British Columbia | When directed; quarterly daily data for licences issued by the BC Energy Regulator | Quarterly for BC Energy Regulator licences | eSubmission for BC Energy Regulator licences |
| Yukon | Annual report on the quantity of water used | The licence anniversary | Yukon Water Board |
| Northwest Territories | Annual water licence report | The licence anniversary | Land and water board |
| Nunavut | Annual report | March 31 | Nunavut Water Board |
Many Ontario holders believe reporting is monthly. Ontario’s regulation sets one annual deadline, and a permit’s conditions can add monitoring on top of it; it is Saskatchewan’s industrial users who do report monthly. Ontario permit holders submit their data through the RSRS, which they access with the same Ontario.ca login as their application.
Permit Conditions, Complaints and Changes
In Ontario, permit holders must comply with the permit’s conditions and “immediately notify the local district office of any complaints arising from the authorized water taking activity”. An administrative change or an amendment is filed within 30 days; an amendment is needed to raise the volume, move the taking or change the conditions. A new owner applies for an ownership change within 30 days, with a no-objection letter from the previous holder, because, as the ministry explains, section 34.1 of the OWRA authorizes issuing a permit to a specific person or organization.
Elsewhere:
- Prince Edward Island’s permit “ceases to be valid” when the land changes hands, and a transfer costs $25.
- Manitoba’s Water Use Licensing page lists a non-refundable $100 fee to transfer a licence; the fee is on that government page, not in the regulation’s fee schedule.
- The territories handle an assignment of a licence like an application ($30).
- Yukon’s Board may cancel a licence unused for three consecutive years.
- Nova Scotia expects holders to “demonstrate beneficial use of the water within three years” of the licence being issued.
- British Columbia applies administrative penalties of up to $100,000 for taking water without an authorization, since January 2024.
Renewing a Permit to Take Water
In Ontario, apply six months before the expiry date of the permit. A renewal for the same or a lesser amount is a category 1 application, unless the permit requires a new study or the taking caused interference or impacts. Within 12 months after expiry, the ministry may issue an interim permit of less than 12 months while it processes the renewal (O. Reg. 387/04 as amended by O. Reg. 179/25). After 12 months, the holder has to obtain a new permit.
Terms and renewal windows elsewhere:
- Quebec: 10 years, renewal at least 120 days before expiry.
- Manitoba: up to 20 years, renewal 365 to 90 days before expiry.
- Alberta: 10 years, or 25 for municipal, agricultural and irrigation purposes, renewable any time before expiry with the same priority.
- Nova Scotia: up to 10 years, with no renewal notice sent by the department.
- Newfoundland and Labrador: set by the minister (a 2024 licence runs five years, with renewal requested 180 days ahead).
- Prince Edward Island: up to five years, renewal within 60 days before or after expiry.
- New Brunswick: approvals up to five years.
- Yukon: type A and type B licences up to 25 years, a renewal requiring a complete new application.
- Northwest Territories and Nunavut: up to 25 years for a type B licence, while a type A licence can run for the life of the project.
Daily Water Records That Hold Up at Reporting Time
A permit to take water comes from the province or territory: from 23,000 litres a day in Nova Scotia, 50,000 litres on any day in Ontario and 75,000 litres a day in Quebec, to most non-domestic uses in British Columbia, Alberta, Saskatchewan and Newfoundland and Labrador. The application runs in six steps, with technical studies for larger or riskier takings. Permit holders record daily volumes, measured by a meter or an accepted method, and report them on deadlines that run from January 31 to March 31 or the licence anniversary. Permits are public, and Ontario publishes the volumes reported for each source.
Willie does not prepare permit applications or the qualified person’s study, and files nothing with any ministry or board: it reads your existing water meters and builds the daily volume record, source by source, that permits across Canada ask for.
Telemetry modules clip onto existing meters in under 10 minutes, with no plumbing or electrical work, and work with meters that have a pulse output: more than 200 models are decoded. Each source then has the metered daily volume that Ontario’s section 9 and Quebec’s direct-measurement rule ask for.
Readings arrive every 5 minutes over LoRaWAN, NB-IoT or 4G, from IP68-rated modules with a 10-year battery. Willie adds them up into daily and monthly totals in the unit each report uses: litres for Ontario’s RSRS, which accepts values pasted from a spreadsheet, and for Quebec’s declaration, cubic metres in the territories.
You can set a real-time threshold alert at the permit’s maximum volume per day, and Willie detects anomalies such as overconsumption or night-time flows in under 30 minutes, 24/7. A company holding permits for several sources, sites or provinces sees them all on one multi-site dashboard, with an open API and flat-file exchange. Up to 10 years of history can be imported to justify the volumes requested at renewal, and metered data replaces Ontario’s permitted-volume fallback or Newfoundland and Labrador’s minimum charge.
Customers spend 0 hours entering meter data and see a 15% average reduction in water consumption in the first year. Eiffage, Meliá Hotels International, Vicat, EQIOM and Mousquetaires already use Willie, supported by a team across France, Québec and Spain.
Schedule a demo with Willie to see how permit holders record how much water each source delivers, with data ready for every report.